DevTrends开发者趋势
主题色

sigmastratum /

sigma-operator-stack

I started working on SOS because noticed that during long-term projects, Codex often loses track of the current status and gets confused. I frequently had to explain what we had already done, which decisions were still v…

DT软件开发DTAgent 能力扩展DTAgent 可观测性DTMCP 服务DTLinuxDTmacOSDTWindowsDTCodex

关于

I started working on SOS because noticed that during long-term projects, Codex often loses track of the current status and gets confused. I frequently had to explain what we had already done, which decisions were still valid, and what needed to be re-verified. Simple file-based governance didn't fully solve this problem. SOS stores a clearly defined "latest state" of the project within the repository. A current or new session retrieves this state via MCP. If something changes after a verification step, the previous result remains in the history but no longer influences the future development trajectory. This isn't automatic chat memory; the state must be explicitly saved and accepted. Missing information isn't filled in via guesswork. We have currently prepared an open-source alpha version focused on Codex; Claude support is planned for future releases. Linux is the primary supported OS. It has also been tested and works on macOS, while the Windows adapter is currently undergoing certification and will be available soon. SOS runs locally or on a server, if you prefer to work directly there. We do not use telemetry. I designed the system to be "agent-first," meaning you can delegate the setup to Codex simply by providing the repository link. The user just needs to provide confirmation at the appropriate steps. I’m interested to see how other users maintain agent state during long-term projects or when switching between agents. Do you find `AGENTS.md` or hand-off notes sufficient? Does governance solve the issue for you, and what challenges do you face? I am particularly interested in scenarios where an old instruction or a previously successful verification is no longer relevant to the current project.

收录记录

  1. Show HN

    2026年9月11日 · 1 次收录

讨论这个产品